LOCATION: Stillwater, Oklahoma
Crafton Tull was hired to design improvements to the Duck Creek Drainage Channel from 3rd to 6th Avenue and from University/Willis to Duck Creek. Our portion will consist of 1785 linear feet of reinforced concrete channel liner with retaining walls. This project is to be designed so that it can be constructed in multiple phases based on City of Stillwater available funds. We will be providing construction and right-of-way acquisition drawings and documents as well as easements and permit requirements. We will also be responsible for topography and boundary surveys, geotechnical studies, hydrology and hydraulics; floodplain, floodway and storm drainage; a preliminary cost estimate, and grading and drainage surfacing.