Fort Sill Tank Trail Repair and Railroad Crossing

Crafton Tull and construction team member The Ross Group provided design-build services for the repair and extension of the Howitzer Road tank trail at Ft. Sill Army base and repair of several railroad crossings at various locations on base. 


The primary task of this project was to repair the existing tank trail alignment paving and extend the pavement east to intersect Berry Street. In addition to the roadway repairs, the project also included options for repair/reconstruction of six railroad crossings that had fallen into disrepair at various locations.  Crafton Tull’s duties on the project included design of paving, drainage, and utility improvements, and design of new concrete panel railroad crossings.

 
In addition to the design duties Crafton Tull also provided construction phase engineering services such as submittal and RFI reviews, preparation of field changes to plans, and project observation to ensure adherence to the project documents and to aid the USACE inspectors in interpretation of the project requirements.