Highway 264 - Lowell, AR

Crafton Tull provided roadway and bridge design for the expansion of Highway 264 from two to five lanes over I-49 and ramp widening and signals at the interchange. The 0.7 mile  project consisted of earthwork, ACHM Base, Binder and Surface Courses, storm drainage system items, traffic signal items, extension of a triple and quadruple R.C. Box Culverts and a continuous composite w-beam bridge, erosion control and miscellaneous items.