Huntsville Avenue - Springdale, AR

Crafton Tull was hired by Springdale to provide a solution for alleviating downtown traffic congestion. By designing a three mile east-west arterial roadway that connected I-49 to U.S. Highway 412, we were able to provide a street design that addressed the City’s needs. Services included topographic and boundary surveys, preparation of easement and right-of-way documents, design and preparation of construction plans and specifications, bid administration, and construction observation services. Crafton Tull coordinated the design and construction of this project with multiple franchise utilities requiring relocation within the project area as well as two other major street widening projects, Monitor Road improvements and the widening of Butterfield Coach Road south of U.S. Highway 412, that either crossed or connected to this project.