Fred Creek Drainage Improvements - Tulsa, OK

The Fred Creek Drainage Improvement project included re-channelization of an existing creek and replacing existing reinforced concrete pipes with adequately sized reinforced concrete boxes at the upstream end of Fred Creek. The project stretches from South Pittsburg Ave. to South Urbana Ave. Beginning near South Urbana Ave., Fred Creek travels through reinforced concrete boxes ranging in size from 7’x4’ to 11’x5’. This portion of the project was approximately 1400 linear feet. The open channel portion of the project begins at the end of the reinforced concrete boxes west of S. Richmond Ave. The open channel is approximately 950 linear feet. There were also some waterline, sanitary sewer, and other utility relocations that were integral parts of this drainage project.