Dixieland Road - Lowell, AR

The City of Lowell hired Crafton Tull to provide engineering services for a 5-lane arterial road through to create a commercial district. The completed roads also provided an alternative north/south link for motorists traditionally using I-49 or Hwy 71. The road was paved with asphalt and used concrete curb and gutter. Work performed included surveying, civil engineering design, preparation of plans and specifications, bidding, and utility coordination.