Sidewalk Improvements - Bentonville, AR

Crafton Tull performed field surveys and design for over 1,800 linear feet of sidewalk improvements in various locations for the City of Bentonville.  The project included sections along SW 8th Street and along Water Tower Road, providing much needed connectivity for pedestrians by filling in gaps between existing stretches of sidewalk.  Work included field surveys, civil engineering design, preparation of plans, specifications, contract documents, and assisting the City with the bidding process.